CDZI Share Price

Open 15.05 Change Price %
High 15.25 1 Day 0.05 0.34
Low 14.75 1 Week 0.05 0.34
Close 14.95 1 Month 0.20 1.36
Volume 109701 1 Year 9.41 169.86
52 Week High 15.65
52 Week Low 5.11
CDZI Important Levels
Resistance 2 15.41
Resistance 1 15.22
Pivot 14.98
Support 1 14.68
Support 2 14.49
NASDAQ USA Most Active Stocks
ASTI 0.00 0.00%
FNFG 10.18 -0.20%
DELL 13.86 0.22%
RFMD 16.59 -2.07%
RIMM 13.03 0.39%
SIRI 5.13 1.18%
BBEP 0.12 0.00%
GTAT 0.44 0.00%
CYTR 0.83 36.07%
SUSQ 14.20 -0.77%
More..
NASDAQ USA Top Gainers Stocks
SPIR 0.02 100.00%
CPSL 0.09 50.00%
LOCM 0.09 50.00%
RITT 0.03 50.00%
OPTT 2.74 49.73%
CYTR 0.83 36.07%
WRES 0.09 28.57%
BSDM 0.62 26.53%
ATRM 1.89 26.00%
SNTA 0.34 25.93%
More..
NASDAQ USA Top Losers Stocks
TXCC 0.01 -95.00%
HCIIP 10.10 -67.52%
CRMB 0.27 -57.81%
KIOR 0.03 -57.14%
OSH 0.26 -49.02%
OSH 0.26 -49.02%
DVOX 0.05 -44.44%
PRXI 0.21 -43.24%
TRGT 0.96 -41.46%
ULTR 0.05 -37.50%
More..

Cadiz, Inc. (NASDAQ: CDZI)

CDZI Technical Analysis 4
As on 24th Apr 2017 CDZI Share Price closed @ 14.95 and we RECOMMEND Strong Buy for LONG-TERM with Stoploss of 9.79 & Buy for SHORT-TERM with Stoploss of 14.69 we also expect STOCK to react on Following IMPORTANT LEVELS.
CDZI Target for April
1st Target up-side 16.09
2nd Target up-side 16.81
3rd Target up-side 17.54
1st Target down-side 14.01
2nd Target down-side 13.29
3rd Target down-side 12.56
CDZI Other Details
Segment EQ
Market Capital 131076776.00
Sector Utilities
Industry Water Utilities
Offical website http://www.cadizinc.com
CDZI Address
CDZI
550 South Hope Street
Suite 2850
Los Angeles, CA 90071
United States
Phone: 213-271-1600
Fax: 213-271-1614
CDZI Latest News
Keeping Tabs on the Technicals For Cadiz Inc. (NASDAQ:CDZI)   Piedmont Register   - 19th Apr 17
Option Market Alert: Cadiz Inc Implied Price Swing Hits An Inflection Point   CML News   - 18th Apr 17
Cadiz Inc Risk Points versus Industrials   CML News   - 08th Apr 17
Cadiz Inc. to Present at 29th Annual ROTH Investor Conference   GlobeNewswire (press release)   - 14th Mar 17
Cadiz Inc. Closes Public Offering of Common Stock and Sr. Debt Refinancing   GlobeNewswire (press release)   - 06th Dec 16
Stock sale nets Cadiz Inc. $9 million to move forward with controversial ...   San Bernardino County Sun   - 02nd Dec 16
Cadiz Inc. Issues Statement on Apparent Bias in Bureau of Land Management's ...   GlobeNewswire (press release)   - 18th Aug 16
Cadiz Inc. announces updates on Cadiz Water Project   WaterWorld   - 16th Feb 16
Cadiz Inc. CDZI (US: Nasdaq)   Wall Street Journal   - 11th Feb 11
15.00   MarketWatch   - 21st Dec 09
Interactive Technical Analysis Chart Cadiz, Inc. ( CDZI NASDAQ USA )
Java support must be enabled in order to display FnCharts.
You can download Java from http://www.java.com
Your Comments and Response on Cadiz, Inc.
CDZI Business Profile
Cadiz Inc. is engaged in acquiring and developing land and water resources. The Company’s primary asset consists of 45,000 acres of land in three areas of eastern San Bernardino County, California. The Company’s portfolio of water resources is located in proximity to the Colorado River and the Colorado River Aqueduct (CRA), the principal source of imported water for Southern California, and provides the Company with the opportunity to participate in a variety of water supply, water storage, and conservation programs with public agencies and other partners. It owns approximately 34,000 acres of land and the subsurface strata, inclusive of the unsaturated soils and appurtenant water rights in the Cadiz and Fenner valleys of eastern San Bernardino County (the Cadiz/Fenner Property). It also own approximately 10,800 additional acres in the eastern Mojave Desert, including the Piute and Danby Dry Lake properties. The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 1,300 square miles. Water Project facilities would include high yield wells designed to recover available native groundwater from beneath the Water Project area; a 43-mile conveyance pipeline to connect the well field to the CRA; a pumping plant to pump water through the conveyance pipeline from the CRA to the Project well-field; an energy source to provide power to the well-field, pipeline and pumping plant, and spreading basins, which are shallow settling ponds that will be configured to percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water. The Company’s landholding is approximately 9,000 acres in the Piute Valley of eastern San Bernardino County. This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California. The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles. In addition, the Company owns an an areage located near Danby Dry Lake, approximately 30 miles southeast of its landholdings in Cadiz and Fenner valleys. Its Danby Lake property is located approximately 10 miles north of the CRA.